Planning permission in Buckinghamshire.

A 60-second guide to extensions, loft conversions, and Permitted Development in Buckinghamshire — plus a free AI check tailored to your project below.

Free 30-second check for Buckinghamshire

Do you need planning permission in Buckinghamshire?

Most householder extensions in England fall under Permitted Developmentrights set out in the General Permitted Development Order (GPDO) 2015 — meaning you don't need full planning permission, provided you stay within the limits.

  • · Single-storey rear extensions: up to 3m deep on terraced or semi-detached, 4m on detached, eaves under 3m. Above that, the Larger Home Extension prior approval route covers up to 6m and 8m respectively.
  • · Two-storey rear extensions: up to 3m deep, must be at least 7m from the rear boundary, no balconies or raised platforms.
  • · Loft conversions: up to 40m³ on terraced houses, 50m³ on detached/semi, no extensions beyond the original front roof slope facing a highway.
  • · Outbuildings: must be single-storey, eaves under 2.5m, ridge under 4m (dual pitch) or 3m (other), within the curtilage of the dwelling and not used as a separate residence.

Buckinghamshire council fees

England-wide statutory fees from the December 2023 fee schedule [G].

Lawful Development Certificate (existing or proposed)

£129

Half the householder fee. Confirms PD status.

Larger Home Extension prior approval

£120

3-6m rear, terrace/semi. 21-day notification.

Householder planning application

£258

Standard route. 8-week determination.

Common rejection reasons in Buckinghamshire

Up to 45% of UK applications [A] get bounced before any officer reads them. Across all councils the most common bounces are:

  • Missing location plan with a red line outlining the site.
  • Existing and proposed elevations not on the same scale.
  • Floor plan dimensions inconsistent with elevations.
  • No Heritage Statement when the site is in a Conservation Area or near a Listed Building.
  • Wrong fee — most rose by ~25% in December 2023.

The full applywell analysis catches every one of these before you submit. Sign in for your first analysis free.

Run a full analysis →

Frequently asked questions about Buckinghamshire

How long do Buckinghamshire planning applications take?▾

Statutory determination is 8 weeks for householder applications and 13 weeks for major schemes. Buckinghamshire can request an extension of time — check the application page on the council portal for the agreed determination date.

Does Buckinghamshire use a Local Validation List?▾

Yes. Every UK council publishes a Local Validation List on top of the national one. Applications missing items from this list are rejected as invalid before review. The applywell analysis cross-checks your drawings against Buckinghamshire's validation requirements.

Can I appeal a Buckinghamshire decision?▾

Yes. Householder appeals must be lodged within 12 weeks of the decision through the Planning Inspectorate. Around 25% of householder appeals succeed. The applywell decision parser extracts every refusal reason verbatim so you can see exactly what to address.

What's the difference between Permitted Development and full planning?▾

Permitted Development means you don't need to apply for full planning permission — but you might still want a Lawful Development Certificate (~£129) as proof for future buyers. Full planning is needed when you exceed PD limits, are in restricted designations, or build something not covered by the GPDO.

Do I still need Building Regulations approval?▾

Yes. Building Regulations are separate from planning — required for almost all building work regardless of whether you need planning permission. Approve via Full Plans (drawings reviewed up front) or Building Notice (inspections during construction).